Project Portfolio
Ventura County Government – Oxnard/Ventura, CA

Scope |
Develop and install a 497 kW DC rooftop solar project at the GSA and County Administration buildings, each with different roof system types, including providing financing for the project under a Power Purchase Agreement. The County awarded the contract to Solar Power Integrators, which then teamed with the financing partner to move the project forward and complete construction |
Complexity |
Involved working over an active building open to the public that is the County’s main point of contact with its citizens; the parking lot where the project was staged was very busy with families and children, and safety was a key element of performance. |
| Project Address |
Multiple |
| System Size |
497 kW DC |
| System Description |
Roof Mounted, 3 buildings - polysilicon modules
|
| Financing |
Power Purchase Agreement
Provided by Solar Power Partners
|
| Completion |
December 2009
|
GSA - Senator Simon Federal Building – Carbondale, IL

Scope |
Turn-key design/build re-roof and 100kW photovoltaic system at the Senator Paul Simon Federal Building in Carbondale, Illinois. With the design phase completed; construction began on this project in the spring of 2010 and was completed in mid-November. A new single ply cool roof with polycrystalline solar panels was installed; contracted through the United States General Services Administration. |
Complexity |
The 100 kW turn-key solar roof top project was on a challenging 30+ degree sloped roof. |
| Project Address |
Carbondale, IL |
| System Size |
100 kW DC |
| System Description |
Roof Mounted, 1 building - polysilicone modules
|
| Financing |
GSA
|
| Completion |
November 2010 |
USS Arizona Memorial Visitor’s Center Replacement – Honolulu, HI
(Sub to Watts Constructors for NAVFAC)

Scope |
Turnkey design-build construction of a 50kW DC on the roof of the USS Arizona Memorial Visitor Center in Honolulu, HI; provide four design options for two types of thin film. The Solyndra™ option was ultimately selected and installed. |
Complexity |
The site is a high-profile location, and the photovoltaic installation had to be wind-rated for tropical weather conditions; the project was part of a large-scale project at the site, and the Solyndra technology, which installs in both series and parallel, requires familiarity with the product, which Solar Power Integrators possesses. |
| Project Address |
Honolulu, HI |
| System Size |
50 kW DC |
| System Description |
Roof Mounted, 1 building - Solyndra™ modules
|
| Financing |
GSA
|
| Completion |
October 2010
|
Awarded Projects in Process
Mono Lake Visitors Center, California
Scope |
The US Department of Agriculture has awarded to Solar Power Integrators a 32 kW DC parking lot solar array. The system, which includes parking lot shade structures with polysilicon photovoltaic modules mounted on top of them, will offset much of the electrical use of the facility. Solar Power Integrators will contract directly with USDA for the project. |
Complexity |
The shade structure will behind the main visitor center and will be designed for a height that accommodates the USDA heavy duty equipment and for snow load that affects the area during winter months. |
| Project Address |
Mono Lake, CA |
| System Size |
32 kW DC |
| System Description |
Shade Structure – Polysilicon modules
|
| Financing |
USDA
|
| Completion |
2011
|
Fresno VA Hospital
Scope |
The General Services Administration has awarded to Solar Power Integrators a 271kW DC multiple roof solar installation for VA Hospital in Fresno California. |
Complexity |
The multiple roofs are of varying types of construction including rock ballast, with various HVAC and former thermal solar installations to remove. In addition, the hospital is located in both residential and commercial areas, so that special consideration will be taken for access, scheduling, and public safety. |
| Project Address |
Fresno, CA |
| System Size |
271 kW DC |
| System Description |
Roof Installation – Polysilicon modules
|
| Financing |
GSA |
| Completion |
2011
|
San Diego VA Hospital
Scope |
The General Services Administration has awarded to Solar Power Integrators a 210 kW DC roof solar installation for VA Hospital in San Diego, California. |
Complexity |
The roof is under complete redesign. Solar Power Integrators is working in conjunction with the Army Corp of Engineers for integration of final roof design and solar integration. In addition, project scheduling is a key element so that roof installation and solar installation will be seamless. |
| Project Address |
San Diego, CA |
| System Size |
210 kW DC |
| System Description |
Roof Installation – Polysilicon modules
|
| Financing |
GSA |
| Completion |
2011
|
|
|